Project WIN Louisville MSD msd-logo-white
  • About Us
    • Federal Consent Decree
    • Louisville’s Sewer Overflows
    • Events Calendar
    • 2012 IOAP Modification
  • How You Can Help
    • Your Community
    • Home & Garden
    • Commercial
    • Fats, Oils, Grease
    • Education
  • Projects
  • Library
  • Public Input
    • Central Relief Drainage Project
    • Clifton Heights Storage Basin
    • I64/Grinstead Basin Project
    • Lexington & Payne CSO Storage Basin
    • Logan/Breckinridge Street Storage Basin
    • Waterway Protection Tunnel (Ohio River Tunnel)
    • Portland CSO Basin
    • Portland Green Infrastructure
    • Shawnee Park Basin (SW PKWY Storage Basin)
    • Story Avenue & Main Street Storage Basin

2018-12-17 MORRIS FORMAN WQTC HEADWORKS PROJECT CERT LTR

Home 2018-12-17 MORRIS FORMAN WQTC HEADWORKS PROJECT CERT LTR

2018-12-17 MORRIS FORMAN WQTC HEADWORKS PROJECT CERT LTR

File size: 243.08 KB
Created: May 7, 2021
Updated: May 7, 2021
Hits: 30
Download Preview
 
 
 

Overflow Advisory Level:

Conditions are normal

Conditions are normal

There is currently little danger of flooding or sewer overflows. If weather conditions change and the advisory level is upgraded, relevant information will be displayed here.

For more information, go to msdprojectwin.org or call MSD Customer Relations at 502-540-6000.

Project WIN msd-logo-white
  • FAQ
  • Contact Us
  • 2012 IOAP Modification
  • Local Rainfall
  • Overflow Alert
  • Youtube
  • Facebook
  • LinkedIn
  • Twitter
  • Instagram
  • (502) 587-0603
  • CommentsIOAP@msdlouky.org
  • Stay Updated

© 2012-2025 Louisville and Jefferson County Metropolitan Sewer District

Site by Net Tango